Live from site. Coming soon.
Real photos from our sites — carpentry, ceilings, finishes — posted here as each stage is completed. Because the way a home is built matters as much as how it looks.
Six stages, photographed.
Each project will be documented stage by stage, so you can see the quality that sits behind the finish.
-
Stage 01
Measure & mark
Final site measurements and marking for every unit, ceiling and light point.
-
Stage 02
Civil & electrical
Wiring, plumbing changes and any civil work, checked before anything is closed up.
-
Stage 03
False ceiling
Gypsum framing, cove and profile-light channels, and the first coat.
-
Stage 04
Joinery install
Factory-made kitchens, wardrobes and units arriving and being fixed on site.
-
Stage 05
Finishes & paint
Panelling, wall finishes, paint and the final layer of detail.
-
Stage 06
Clean & handover
Deep cleaning, the room-by-room walkthrough and the keys.
What we check on every site
A site supervisor coordinates every trade and checks quality at each stage, so what is built matches what you signed off.
- Measurements matched to drawings
- Board grades as specified
- Edge banding on every cut edge
- Hardware alignment and soft-close
- Electrical points before closing
- Snag list closed before handover